Everything You Need to Know About ADUs in San Diego

Accessory Dwelling Units are transforming San Diego properties. Learn about types, permitting, zoning, costs, and how we can help you build your perfect ADU.

Understanding ADUs

What is an ADU?

An Accessory Dwelling Unit (ADU) is a secondary housing unit on a single-family residential lot. Also known as granny flats, in-law suites, backyard cottages, or casitas, ADUs provide independent living spaces with their own kitchen, bathroom, and sleeping area.

California has passed landmark legislation making it easier than ever to build ADUs, and San Diego has embraced these changes to address housing needs while giving homeowners new opportunities for income and flexibility.

Did You Know?

San Diego issued over 2,500 ADU permits in 2023 alone - more than any other California city outside Los Angeles.

Modern ADU example
ADU Options

Types of ADUs

Choose the ADU type that best fits your property, budget, and goals.

Detached ADU
Detached ADUUp to 1,200 sq ft

A standalone structure separate from the main house, typically in the backyard.

Attached ADU
Attached ADUUp to 1,200 sq ft

An addition built onto the existing home, sharing at least one wall.

Garage Conversion
Garage ConversionVaries by existing structure

Converting an existing garage into a livable dwelling unit.

Junior ADU (JADU)
Junior ADU (JADU)Up to 500 sq ft

A smaller unit within the existing home footprint, often a converted bedroom.

Why Build an ADU?

Benefits of Adding an ADU

Rental Income

Generate $1,500-$3,000+ monthly rental income in San Diego

Multi-Generational Living

Keep family close while maintaining privacy

Property Value

Increase your home value by 20-30%

Flexibility

Home office, guest house, or Airbnb rental

The Process

How ADU Permitting Works in San Diego

We handle the entire permitting process for you. Here's what to expect.

1
1-2 days

Site Assessment

We evaluate your property to determine the best ADU type, placement, and design options.

2
2-4 weeks

Design & Plans

Our architects create detailed plans that comply with San Diego building codes and zoning requirements.

3
1-2 weeks to submit

Permit Application

We submit your plans to the City of San Diego for review and handle all required documentation.

4
4-8 weeks typical

City Review

The city reviews plans for zoning, building codes, fire safety, and utility connections.

5
Varies

Permit Approval

Once approved, you receive building permits and we can begin construction.

6
4-6 months

Construction & Inspections

We build your ADU with regular city inspections at each phase (foundation, framing, electrical, plumbing, final).

Zoning & Regulations

San Diego ADU Zoning Rules

Understanding zoning requirements is crucial for ADU planning. Here are the key regulations.

Setback Requirements

Detached ADUs typically require 4ft side and rear setbacks. Garage conversions may have no setback requirements.

Height Limits

ADUs are generally limited to 16ft for detached units, though two-story ADUs up to 18ft may be permitted in some zones.

Lot Coverage

San Diego allows ADUs even if they exceed typical lot coverage limits, as long as the ADU is under 800 sq ft.

Owner Occupancy

As of 2020, owner-occupancy requirements are suspended for ADUs permitted before 2025.

FAQs

Frequently Asked Questions

How much does an ADU cost in San Diego?

ADU costs typically range from $150,000 to $350,000+ depending on size, finishes, and site conditions. Garage conversions start around $100,000. We provide detailed estimates during our free consultation.

Do I need to provide parking for an ADU?

In most cases, no. California law eliminates parking requirements for ADUs within half a mile of public transit, in historic districts, or when part of an existing structure. San Diego has adopted these state-wide exemptions.

Can I build an ADU on any property?

Most single-family and multi-family residential properties in San Diego can have an ADU. Some restrictions apply in certain zones or for properties with HOA covenants. We assess eligibility during our free consultation.

How long does the entire ADU process take?

From design to move-in ready, expect 8-14 months total. This includes 2-4 weeks for design, 4-8 weeks for permits, and 4-6 months for construction. We work to minimize delays at every stage.

Can I use my ADU as a short-term rental (Airbnb)?

San Diego allows short-term rentals in ADUs, but regulations vary by zone. Some areas require a short-term rental permit and have occupancy limits. We can help you understand the rules for your property.

What utilities does an ADU need?

ADUs need connections for electricity, water, sewer, and typically gas. In many cases, ADUs can connect to existing utilities. Separate meters may be required or optional depending on your rental plans.

Ready to Build Your ADU?

Get a free consultation and find out if your property is eligible. Our team handles everything from design to permits to construction.

Disclaimer: The information on this page is for general guidance only and may not reflect the most current California or local ADU regulations. Zoning rules, setback requirements, utility rules, and permit processes can change. Always confirm requirements with your local city or county building department and consult with a licensed design professional before starting any project. Modern Construx is not liable for decisions made based solely on this information.